摘要
将不确定的加工时间用三角模糊数表示,研究了梯形软交货期下的模糊车间作业满意调度问题.通过梯形交货期和三角模糊完工时间确定的两个悲观点实现了客户对产品提前或拖期情形下的悲观满意度,同时兼顾最可信满意度,利用三点满意度的组合优化建立了优化目标.仿真实验结果表明,所建立三点满意调度模型相对传统悲观调度模型,在保证决策者抗风险偏向的同时,大大提高了最可信满意度水平,实现了更加综合的满意调度.
A fuzzy job-shop satisfaction scheduling problem with a trapezoid due date soft constraint is discussed, where the uncertain processing times of operations are described by triangle fuzzy numbers. The pessimistic satisfaction degree in terms of earlier or later completion time than the due date is realized by identifying two pessimistic points while the possibility for the most possible result being considered, thus the satisfaction scheduling optimization objective is established to maximize the combination of three point satisfaction degrees. The simulation results show that the proposed three-point satisfaction-degree scheduling model can greatly improve the client's most possible satisfaction degree while keeping the decision maker's risk-resisting preference, and can realize a more comprehensive satisfaction schedule compared with a traditional pessimistic scheduling model.
出处
《控制与决策》
EI
CSCD
北大核心
2012年第7期1082-1086,共5页
Control and Decision
基金
国家自然科学基金项目(60874076)
关键词
模糊车间作业调度
软交货期
满意度
抗风险
可信度
fuzzy job-shop scheduling
soft due date
satisfaction degree
risk-resisting
possibility