摘要
为解决增层改造施工过程影响既有建筑正常使用的问题,结合哈尔滨南岗会堂增层改造工程,研究了既有房屋套建巨型框架增层的设计方法与施工措施.巨型框架选用悬挂结构体系,次框架的竖向荷载通过吊柱传至主框架.主框架由内置H型钢预应力混凝土组合梁和角钢混凝土柱组成,次框架由型钢混凝土梁和型钢混凝土柱组成,施工阶段采用自承重现浇混凝土结构体系,实现既有建筑在施工过程中的正常使用.
To solve the problem of that the construction process for original buildings story-adding prevents its usual work,taking Harbin Nangang Hall as demonstration,the adding project of huge frame including main frame around old buildings and sub frame is studied.The vertical load is transmitted from sub frame to main frame by the davit.The main frame is composed by prestressed concrete beams with encased H-steel and angle-steel concrete columns,and the sub frame is composed by encased steel beams hanging and encased steel columns over the huge frame.Design and construction methods of self-supporting concrete structure are presented to ensure that original building works as usual during the construction.
出处
《哈尔滨工业大学学报》
EI
CAS
CSCD
北大核心
2012年第6期45-50,共6页
Journal of Harbin Institute of Technology
基金
国家教育部长江学者奖励计划资助项目(2009-37)
黑龙江省科技攻关项目(GC09C205)
黑龙江省科技推广项目(TC10A0101)
关键词
套建增层
巨型框架
角钢混凝土柱
组合梁
outer-jacketing structures for story-adding
huge frame
angle-steel concrete column
composite beam