摘要 为解决增层改造施工过程影响既有建筑正常使用的问题,结合哈尔滨南岗会堂增层改造工程,研究了既有房屋套建巨型框架增层的设计方法与施工措施.巨型框架选用悬挂结构体系,次框架的竖向荷载通过吊柱传至主框架.主框架由内置H型钢预应力混凝土组合梁和角钢混凝土柱组成,次框架由型钢混凝土梁和型钢混凝土柱组成,施工阶段采用自承重现浇混凝土结构体系,实现既有建筑在施工过程中的正常使用. To solve the problem of that the construction process for original buildings story-adding prevents its usual work,taking Harbin Nangang Hall as demonstration,the adding project of huge frame including main frame around old buildings and sub frame is studied.The vertical load is transmitted from sub frame to main frame by the davit.The main frame is composed by prestressed concrete beams with encased H-steel and angle-steel concrete columns,and the sub frame is composed by encased steel beams hanging and encased steel columns over the huge frame.Design and construction methods of self-supporting concrete structure are presented to ensure that original building works as usual during the construction.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2012年第6期45-50,共6页 Journal of Harbin Institute of Technology
基金 国家教育部长江学者奖励计划资助项目(2009-37) 黑龙江省科技攻关项目(GC09C205) 黑龙江省科技推广项目(TC10A0101)
关键词 套建增层 巨型框架 角钢混凝土柱 组合梁 outer-jacketing structures for story-adding huge frame angle-steel concrete column composite beam
  • 相关文献

参考文献7

  • 1郑文忠,王英,刘铁,谭军.对既有房屋套建增层改造的认识与思考[J].工业建筑,2005,35(4):1-5. 被引量:40
  • 2孙绪杰,郑文忠.对施工阶段套建增层巨型框架的内力分析[J].哈尔滨工业大学学报,2009,41(6):16-21. 被引量:4
  • 3REGAN R S, KRAHL N W. Behavior of prestressedcomposite beams[ J]. Journal of the Structural Division, ASCE, 2003, 93(6): 87- 108.
  • 4SAADATMANESH H, ALBRECJL P, AYYWB B M. Experimental study of prestressed conmposite beams[J]. Journal of the Structural Engineering, ASCE, 2004, 115(9): 2364-2381.
  • 5.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002..
  • 6JGJ138-2001,型钢混凝土组合结构技术规程[S].北京:中国建筑工业出版社,2002.
  • 7KOSTESKI N, PACKER J A, PUTHLI R S. A finite element method based yield load determination procedure for hollowstructural section connections [ J ]. Journal of Constructional Steel Research, 2003, 59(4): 453-471.

二级参考文献16

  • 1郑文忠,周威,田石柱,李平.哈工大动力楼巨型框架增层结构设计与测试[J].建筑结构,2004,34(9):3-6. 被引量:10
  • 2CHEN W F,LIU X L.Study of concrete framed structures during construction,special session on ' Safety Consideration During Construction'[C],ASCE convention.New Orleans,Oct.,1982(10):25 -29.
  • 3LIU X L,CHEN W F,BOWMAN M.Construction load analysis for concrete structures[J].Journal of Structural Engineering,ASCE,1985 (5):1019-1036.
  • 4LIU X L.Sore-Slab interaction in concrete buildings[J].ASCE,Journal of Construction Engineering and Manngement,1986(2):227 -244.
  • 5DUAN M Z,CHEN W F.Improved simplified method for slab and shore load analysis during construction[R].Project Report:CE-STR -95-24,Indiana,USA:Purdue University,1995.
  • 6Comite Euro-International du Beton CEB-FIP Model Code 1990[S].Thomas Telford House,Switzerland,1991.
  • 7郑文忠,谭军,刘铁,等.无支撑自承重现浇混凝土楼盖:中国,200410013554.1[P].2007-02-07.
  • 8郑文忠.黑龙江省科技攻关计划项目既有房屋套建增层改造、功能改造及加固改造成套技术研究可行性研究报告[R].哈尔滨工业大学土木工程学院,2004..
  • 9郑文忠.哈尔滨市科学技术计划项目既有房屋套建增层改造成套技术可行性研究报告[R].哈尔滨工业大学土木工程学院,2004..
  • 10谭军.[D].哈尔滨:哈尔滨工业大学,2004.