介绍河曲电厂二期600 MW超临界直流锅炉螺旋水冷壁安装方法,并对施工过程中发生的问题进行分析处理以及施工中采取的一些主要措施进行总结,旨在共同提高安装工艺水平,为电站的安全稳定高效运行提供坚实的基础。
The installing method of Hequ Power Plant 600 MW supercritieal boiler water wall is introduced. The problems that occurred during the construction process are analyzed and the countermeasures mainly adopted are summarized so that the installation skills are imProved and stability of plant operation is ensured.