摘要 综合运用动态分析、数值模拟、油藏工程等方法,系统评价新海27块二次开发实施效果,认识到二次开发虽然取得较好的效果,但是由于段间差异造成水平井段动用不均,且新增储量未充分动用,因此仍具有一定的剩余潜力,提出了二次开发部署意见及调整方向。经现场实施后获得初步效果,新投产水平井初期日产油为10 t/d以上,断块日产量恢复到280 t/d,为全面实现二次开发指标提供了有力的技术支撑,对于进一步完善二次开发技术体系具有重要的指导意义。 Performance analysis,numerical simulation and reservoir engineering methods are comprehensively applied to systematically evaluate the redevelopment response for Xinhai 27 block.It is conceded that redevelopment does have good response,but reserves have been produced unevenly along horizontal section due to reservoir heterogeneity,therefore there is still certain residual oil potential,and suggestions are proposed for redevelopment reconciliation.Field application has achieved preliminary effect,with initial oil production over 10 t/d from new horizontal well and block production resumed to 280 t/d,thereby provided robust technical support for fully realizing redevelopment index and further improving technological system.
作者 盛聪
出处 《特种油气藏》 CAS CSCD 北大核心 2012年第3期84-86,155,共3页 Special Oil & Gas Reservoirs
基金 辽河油田重大科技项目"辽河油田二次开发技术研究与规模化应用"(中油辽字〔2011〕121号)部分研究内容
关键词 二次开发 水平井 效果评价 扩大部署 新海27块 redevelopment horizontal well response evaluation expanding deployment Xinhai 27 block
  • 相关文献

参考文献10

二级参考文献18

共引文献303

同被引文献21

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部