摘要
彻底关泥石流沟位于映秀镇上游约18 km处,在建映(秀)汶(川)高速公路途经该沟谷沟口段,设计以隧道形式穿过彻底关沟下部。据物源分布情况的综合调查分析,彻底关沟再次爆发泥石流的可能性和危害性均较大。本文通过系统分析工程区地貌条件、区域地质构造、地层岩性等因素揭示了泥石流形成条件,并对其重要的动力学参数进行了计算,最后对在建高速公路彻底关沟段进行了危险性评价。
Debris flow has a wide distribution in Chediguangou of Yingxiu-Wenchuan highway, which is 18km away from Yingxiu town. According to investigation, debris flow outbreak in Chendiguangou is more possible and fatal. While it happens, there is a seri- ous threat to nearby highway construction. The tunnel in this section of Yingxiu-Wenchuan highway is adopted. The paper systematically analyzes high and precipitous geomorphology, complex geologic structure, and stratum lithology, and reveals the reasons causing debris flow and hazards zone of construction.
出处
《西华大学学报(自然科学版)》
CAS
2012年第4期108-112,共5页
Journal of Xihua University:Natural Science Edition