7[1]MEDHURST T P,BROWN E T.A study of the mechanical behavior of coal for pillar design[J].Int J Rock Mech Min Sci,1998,35(8):1087-1105.
8[4]QU Qun-di.Study on distressing technology for a roadway driven along goaf in a fully mechanized top coal caving face[J].Journal of Coal Science & Engineering,2003,9(1):33-37.
9[6]JAYANTHU S,SINGH T N,SINGH D P.Stress distribution during extraction of pillars in a thick coal seam[J].Rock Mechanics and Rock Engineering,2003(11):1-22.
10[10]罗田郎,崔子春,赵梦晨,等.黄荆坝隧道DK254+790~DK254+810处坍方处理[J].现代隧道技术,2001,38(3):51-56.(Lou Tianlang,Cui Zichun,Zhao Mengchen,et al.Countermeasure for the ground collapse during the excavation of Huangjingba Tunnel DK254+790-DK254+ 810[J].Modern Tunneling Technology,2001,38(3):51-56.(in Chinese))