期刊文献+

三峡工程高性能大坝混凝土配合比设计技术措施 被引量:15

The technical measures for the mix design of the concrete dam in Three Gorges Project
下载PDF
导出
摘要 本文介绍了三峡工程大坝混凝土配合比设计思想及采取的技术措施 .通过采用优质缓凝高效减水剂、引气剂、Ⅰ级粉煤灰、具有微膨胀性质的中热水泥、限制原材料及混凝土中总碱含量、并缩小水胶比、增大粉煤灰掺量等综合措施和技术路线 ,有效地降低了混凝土用水量 ,改善了混凝土工作性 ,保证了混凝土抗冻耐久性 ,提高了混凝土的体积稳定性 。 In this paper, the measures adopted in the design of concrete mix for the dam in Three Gorges Project are described.The technical measures include high quality water reducing agent, air entrainment additive, first grade fly ash, micro expensive middle heat cement, controlling the alkali content in raw material and concrete, reducing the water cement ratio, increasing the amount of fly ash. These measures efficiently lowered the water requirement, improved the workability and durability as well as the volume stability of concrete. High performance concrete for dam is attained.
出处 《水利学报》 EI CSCD 北大核心 2000年第5期49-53,共5页 Journal of Hydraulic Engineering
关键词 三峡大坝 高效减水剂 高性能混凝土 配合比 Three Gorges Project water reducing agent fly ash micro expensive cement high performance concrete
  • 相关文献

同被引文献158

引证文献15

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部