期刊文献+

供应链提前期风险空间传递机理与控制策略 被引量:11

Lead-time Risk Transfer Mechanism and Control Policies in Supply Chain
原文传递
导出
摘要 针对供应链结构特性,本文分析了供应链提前期风险在链状供应链上的空间传递机理;根据风险因素作用的特点,将提前期风险划分为节点企业自身提前期风险、物流延期风险和传递风险。在此基础上,构建了供应链提前期风险空间传递模型和供应链提前期风险控制机理框架,并提出了关键的控制策略;最后通过算例分析验证了模型的有效性。 By analyzing the structure of supply chain,this paper investigates the lead-time risk transfer mechanism in a serial supply chain.The lead-tine risks are decomposed into the risk caused by node enterprise itself,the logistics postponement risk and the transfer risk according to the action features of the risk factors.Then,the lead-time risk transfer model and lead-time risk transfer control framework model are put forward.Based on those models,some key policies are proposed to optimize the performance of the supply chain.Finally,a numerical computation is given to illustrate the effectiveness of both the models and the risk control policies.
出处 《管理评论》 CSSCI 北大核心 2012年第6期151-159,共9页 Management Review
基金 国家自然科学基金项目(71072034 70672039)
关键词 供应链风险 提前期风险 风险传递机理 风险控制策略 supply chain risk lead-time risk risk transfer mechanism risk control policy
  • 相关文献

参考文献17

  • 1(美)谢菲著,杨晓雯等译.柔韧[M].上海:上海三联书店,2008.
  • 2Zsidisin G. A. A Grounded Definition of Supply Risk[J]. Journal of Purchasing & Supply Management, 2003,9(5/6):217-224.
  • 3Chopra S., Sodhi M. S. Managing Risk to Avoid Supply-chain Breakdown[J]. MIT Sloan Management Review, 2004,46(1):53-62.
  • 4Tang C. S. Perspectives in Supply Chain Risk Management[J]. International Journal of Production Economics, 2006,103(2):451-488.
  • 5Kleindorfer P. R., Saad G. H. Managing Disruption Risks in Supply Chains[J]. Production and Operations Management, 2005,14(1): 53-68.
  • 6徐娟,刘志学.基于界面管理的物流外包风险识别[J].物流技术,2007,26(3):14-17. 被引量:7
  • 7Zheng C. Z., Liu Z. X., Wang X. J., et al. Entropy Based Risk Measurement and Its Application in Logistics Outsourcing[C]. Proceedings of the 2008 International Conference on E-Risk Management (ICeRM 2008), 2008:161-166.
  • 8Ahmed S., Cakmak U., Shapiro A. Coherent Risk Measures in Inventory Problems[J]. European Journal of Operational Research, 2007382(1):226-238.
  • 9Gaudenzi B., Borghesi A. Managing Risks in the Supply Chain Using the AHP Method[J]. The International Journal of Logistics Management, 2006,17(1):114-136.
  • 10魏晨,马士华.基于瓶颈供应商提前期的供应链协同契约研究[J].中国管理科学,2008,16(5):50-56. 被引量:15

二级参考文献74

共引文献146

同被引文献120

引证文献11

二级引证文献93

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部