山口水电站工程混凝土重力坝坝基灌浆处理 被引量:4

Concrete gravity dam foundation grouting of Shankou Hydropower Station
下载PDF
导出
摘要 结合山口水电站工程混凝土重力坝坝基工程地质条件,介绍了坝基开挖、断层处理要点,以及坝基固结灌浆、帷幕灌浆的技术要求和施工工艺。对投运后大坝各项监测数据进行分析,结果均在正常范围之内,大坝运行正常,证明坝基处理方法得当,效果好。 Combined with analysis of engineering geological conditions, an introduction was made on the construction of concrete gravity dam foundation of Shankou Hydropower Station, including foundation excavation, treat- ment of fault, technical requirements and construction technique of foundation consolidation grouting and curtain grouting. All monitoring records of main dam since it was put into operation are all within normal range, demonstrat- ing that treatment measures for dam foundatinn rt^ndt^r~ cr.nrl ,~ff,=o~
作者 封竟业
出处 《广西水利水电》 2012年第3期46-48,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 坝基 地质条件 断层处理 固结灌浆 帷幕灌浆 效果 Dam foundation geological condition fauhtreatment consolidation grouting curtain grouting effect
  • 相关文献

参考文献2

  • 1SL62-94,水工建筑物水泥灌浆技术规范[S].
  • 2DL/T 5211-2005,大坝安全监测自动化技术规范[S].

共引文献21

同被引文献11

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部