摘要 广西桂林恭城县刘家洞水电站枢纽工程的大坝设计坝型为全碾压混凝土重力坝,大坝总长166m,最大坝高60.7 m,坝项宽7 m,整个坝体共设置6条横缝。在碾压混凝土大坝的施工中,通过采用碾压混凝土传统的通仓薄层连续浇筑法与斜层平推铺筑法相结合的技术及横缝采用设置诱导孔等施工技术,提高了桂林恭城刘家洞水电站工程的质量,加快了施工进度,并取得了显著的经济效益。 The dam type design for Liu Jiadong hydropower dam in Gongcheng county, Guilin, Guangxi, is roller com- pacted concrete gravity dam. The total length is 166 meters, maximum height 60.7 meters, crest width 7 meters and there are altogather 6 transverse joints. Adopting such methods as confiniously pouring without longitudianl joint, the traditional roller compacted concrete, slop layer paving, setting inducing holes in the transverse joints and so on to, the construction has improved the dam quality, speeded up the construction pace and thus achieved obvious ecnomic profits.
作者 陈雪娟
出处 《企业科技与发展》 2012年第7期111-113,共3页 Sci-Tech & Development of Enterprise
关键词 碾压混凝土大坝 施工 技术 roller compacted concrete dam construction technology
  • 相关文献

参考文献2

共引文献8

同被引文献3

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部