摘要
通过对10/8ST-AH渣浆泵过流试制件失效情况的分析,找出了过早失效的原因,并提出改进方法。
Ineffectiveness is fully analyzed in this paper for the over-flow test parts 10/8ST-AH slurry pump manufactured in the company. Causes of failures are found out and improving measures are put forward.
出处
《矿山机械》
北大核心
2000年第3期64-64,共1页
Mining & Processing Equipment