摘要
塑木复合材料栏杆的安装技术直接影响其安全性及使用寿命。探讨了塑木栏杆系统施工安装技术要求,结构性能要求,安装具体步骤及注意事项。安装步骤包括:前期准备,内衬立柱安装,安装空芯塑木立柱,组装扶手、隔条和底部支撑块,安装上下扶手到立柱上,安装盖帽。本研究可对塑木栏杆的合理施工提供指导作用。
The installation technique of wood-plastic composite guardrail directly affects its safety and service life. Installation technical requirements,structure performance requirements,installation steps and note points of wood-plastic composite guardrail system are discussed in this paper. Installation steps include preparation and installation of the following part:lining of post,post sleeve,top and bottom rail,skirt,railing support brackets,foot block and post cap. The aim is to provide a reasonable guideline for WPC guardrail installation.
出处
《新型建筑材料》
2012年第7期16-18,42,共4页
New Building Materials
基金
国家自然科学基金(30871968
31170514)
高等学校博士学科点专项科研基金(20113204110011)
江苏省高校优势学科建设工程项目(PAPD)
江苏省研究生培养创新工程项目(CXZZ11-0525)
关键词
塑木复合材料
栏杆系统
安装技术
wood-plastic composites
guardrail system
installation technique