基于进度的软件外包项目风险优化控制决策 被引量:7

Risk optimization control decision-making of software outsourcing project based on schedule
原文传递
导出
摘要 软件外包项目中的进度风险是软件项目管理的重要内容.针对软件外包的特点,对软件项目的时间-费用交换问题(TCTP)进行研究,提出通过优化软件过程达到进度风险控制的思路.以开发者的收益最大化为目标构建了基于进度的软件项目风险优化控制决策模型,并设计了相应的粒子群算法.最后通过一个算例验证了模型的有效性.该模型充分考虑了开发者收益最大化的目标,为软件项目开发者进行风险控制提供了思路和方法. Schedule risk of software outsourcing projects is an important topic in software project management.According to the characteristics of the software outsourcing,time-cost trade-offs problem of software project(STCTP)is studied.In order to control schedule risk,software process should be optimized.An optimization control decision-making model of software project is proposed,of which the object is to maximize the developers’earnings.A particle swarm optimization(PSO)algorithm is designed to solve the model.Finally,the validity of the model is verified by a numerical example.This model fully considered the income maximization of providers,and provides a new idea and method for developers to control the risk of software projects.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2012年第3期385-388,共4页 Engineering Journal of Wuhan University
基金 国家杰出青年项目(编号:70925004) 国家社科项目(编号:10CGL005)
关键词 进度风险 软件外包项目 优化控制 schedule risk software outsourcing project optimization control
  • 相关文献

参考文献11

  • 1Chow T, Cao D. A survey study of critical success factors in agile software projects [J]. Journal of Sys- tems and Software, 2008,81(6):961-971.
  • 2Fleming Q W, Koppelman J M. Earned value project management a powerful tool for software projeets [J]. Journal of Defense Software Engineering, 1998, ( 7 ) 18-23.
  • 3Jiargen Mianch, Jens Heidrich. Software project con trol centers: concepts and approaches [J]. Journal of Systems and Software, 2004,70 (1-2) : 3-19.
  • 4Boehm B. Anchoring the software process[J]. IEEE Software, 1996,13(4) :73-82.
  • 5Vanhoucke M, Demeulemeester E W H. Discrete time/cost trade-offs in project scheduling with time- switch constraints [J]. Journal of the Operational Re- search Society, 2002,53 : 741-751.
  • 6Tareghian H, Taheri H. An application of randomized minimum cut to the project time/cost tradeoff problem [J]. Applied Mathematics and Computation, 2006, 173(2) : 1200-1207.
  • 7Wuliang P, Chengen W. A multi-mode resource-con- strained discrete time-cost tradeoff problem and its ge- netic algorithm based solution [J]. International Jour- nal of Project Management, 2009,27(6) :600-609.
  • 8Jalote P, Saxena A. Optimum control limits for em- ploying statistical process control in software process [J]. IEEE Transactions on Software Engineering, 2002,28(12) : 1126-1134.
  • 9徐如志,钱乐秋,龚洪泉,李维宏.软件风险管理及优化控制[J].计算机工程,2005,31(9):73-76. 被引量:8
  • 10潘春光,陈英武,汪浩.软件项目风险管理理论与方法研究综述[J].控制与决策,2007,22(5):481-486. 被引量:33

二级参考文献64

  • 1Boehm B.A Spiral Model of Software Development and Enhancement.Tutorial: Software Engineering Project Management,IEEE Computer Society Press,Washington,DC,1987:28-142
  • 2Charette R N.Large-scale Project Management Is Risk Management.IEEE Software,1996-07:110-117
  • 3Brown W.AntiPatterns: Refactoring Software,Architectures,and Projects in Crisis.New York,Wiley Computer Publishing,1998
  • 4Brown N.Industrial-strength Management Strategies.IEEE Software,1996-07: 94-103
  • 5Jalote P.CMM in Practice:Process for Executing Software Projects at Infosys.Addison-Wesley,2000: 5-117
  • 6Madachy R.Heuristic Risk Assessment Using Cost Factors[J].IEEE Software,1997-05/06:51-59
  • 7Risk Management Overview.Copyright 2002 by Carnegie Mellon University,Last Modified: www.sei.cmu.edu http://www.sei.cmu.edu,20020-04-03
  • 8Williams R.Putting Risk Management into Practice[J].IEEE Software,1997-05/06:75-82
  • 9CMMI Distilled: A Practical Introduction to Integrated Process Improvement.Translated by Zhou B S.China Machine Press,2002: 79-84
  • 10Elaine M.Managing Risk: Method for Software Systems Develo- pment.Addison-Wesley,1998: 69-101

共引文献37

同被引文献40

引证文献7

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部