四川安谷水电站勘探竖井及试验平硐施工工艺 被引量:1

Construction Technology of Exploration Shaft and Test Adit of Hydropower Station in Sichuan
下载PDF
导出
摘要 四川安谷水电站勘探竖井所处地层河床砂卵石层深厚,采用传统的人工挖掘护壁或沉井施工工艺,施工难度大。针对地层的特点,采用冲击钻机成孔的方式施工。同时,在竖井中开挖试验平硐,遵循多炮眼、小进尺、小药量,光面爆破的施工方案,圆满完成试验平硐的开挖。介绍了其施工技术及注意事项。 The sand-and-cobble layer of river bed is thick in the exploration shaft of Angu hydropower station of Sichuan, the construction was difficult to use traditional wall protection by manual digging. According to the formation characteristics, boring was constructed with percussion drill. And test adit was dug in the shaft, following the construction of scheme of more blast hole, small scale of drilling footage, small charge and smooth blasting.
出处 《探矿工程(岩土钻掘工程)》 2012年第6期80-84,共5页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 勘探竖井 平硐 冲击成孔 光面爆破 深厚砂卵石层 水电站 exploration shaft adit impact holing smooth blasting thick sand-and cobble layer hydropower station
  • 相关文献

参考文献4

二级参考文献2

  • 1北京城建集团有限责任公司.GB50299--1999地下铁道工程施工及验收规范(2003版)[S].北京:中国计划出版社,2003.
  • 2上海建工(集团)总公司,上海现代建筑设计(集团)有限公司.DG/TJ08-202-2007钻孔灌注桩施工规程[S].北京:中国标准出版社,2007.

共引文献122

同被引文献20

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部