摘要 为解决多级多目标组批投放决策协同优化算法,对建模工具进行分析,选择基于微软Aglet的移动智能体(Agent)和基于Flexsim的仿真相结合的建模技术,系统控制采用混合控制结构以避免传统多Agent系统的缺陷;设计了锻造多级、多目标组批协同求解框架,给出了多Agent协作模型和基于统一建模语言的协同过程。提出基于强化Q学习的改进型多目标前向投放控制策略作为多级多目标协同算法。对可能影响实验结果的生产系统参数设置作了对照实验,实验研究了不确定条件下不同算法的拖期数和成本表现,结果表明本文算法明显优于传统的前向投放策略,生产系统的输出具有很好的稳定性。 To solve multi-level and multi-objective batch delivery collaboration optimization, the modeling tool was analyzed, and the modeling technology by combining Aglet based mobile Agent with Flexsim based simulation was selected. To avoid traditional multi-Agent system's shortcomings, a hybrid control structure was adopted in system. The solving frame of forging multi-level and multi-objective was designed, and multi-Agent collaboration model as well as Unified Modeling Language(UML)based collaborative process were given. An improved Look-ahead Batc- hing Rule(LBCR)strategy based on improved Q-learning algorithm was proposed to serve as multi-level and multi - objective collaborative algorithm. The control experiment was used for production system's parameters which may affect the experiment result, and the tardiness as well as cost of different algorithms in uncertain condition were studied. The results showed that the proposed algorithm was better than the traditional LBCR strategies and the output of production system had strong stability.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2012年第6期1182-1194,共13页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70801036 71071075) 南京工业大学学科基金资助项目(39715005) 江苏省自然科学基金资助项目(BK2010555)~~
关键词 锻造 组批 多目标优化 协同决策 多智能体 重构 博弈论 forging batch multi-objective optimization collaborative decision multi-Agent reconstruction game theory
  • 相关文献

参考文献26

  • 1BITRAN G R, HAAS E A, HAX A C. Hierarchical produc- tion planning: a single stage system[J]. Operation Research,1981,29(4):717-743.
  • 2BITRAN G R, HAAS E A, HAX A C. Hierarchical produc- tion planning: a two-stage system[J]. Operation Research, 1982,30(2) : 232-251.
  • 3BOWERS M R, JARVIS J P. A hierarchical production plan- ning and scheduling model[J]. Decision Sciences, 1992,23 ( 1 ) : 144-159.
  • 4MEYBODI M Z. Integrating production activity control into a hierarchical production-planning model[J]. International Jour- nal of Operations and Production Management, 1995, 15 (5): 4-25.
  • 5KRAUS S. Negotiation and cooperation in multi-Agent envi- ronments[J]. Artificial Intelligence, 1997,94(1/2) :79-97.
  • 6LESSER V R. A retrospective view of FA/C distributed prob- lem solving[J]. IEEE Transactions on Systems, Man and Cy- bernetics, 1991,21(6) : 1347-1363.
  • 7LEVESQUE H J. All I know: a study in auto-epistemic logic [J]. Artificial Intelligence,1990,42(2/3):263-309.
  • 8GROSZ B J, KRAU S. Collaborative plans for complex group activities[J]. Artificial Intelligence, 1996,86(2) :69-357.
  • 9SMITH R G. The contract net protocol high-level communica- tions and control in a distributed problem solver[J]. IEEE Transactions on Computers, 1980,29(12) :1104-1113.
  • 10DURFEE E H, LESSER V R. Using partial global plans to coordinate distributed problem solvers[C]//Proceedings of the 10th International Joint Conference on Artificial Intelli- gence. San Francisco, Cal. , USA: Morgan Kaufmann, 1987: 875-883.

二级参考文献49

  • 1祁国宁,杨青海.大批量定制生产模式综述[J].中国机械工程,2004,15(14):1240-1245. 被引量:60
  • 2AHMADI J H,AHMADI R H,DASU S,et al.Batching and scheduling jobs on batch and discrete processors[J].Operations Research,1992,40(4):750-763.
  • 3GURNANI H,ANUPINDI R,AKELLA R.Control of batch processing systems in semiconductor wafer fabrication facilities[J].IEEE Transactions on Semiconductor Manufacturing,1992,5(4):319-328.
  • 4BHATNAGAR R,CHANDRA P,LOULOU R,et al.Order release and product mix coordination in a complex PCB manufacturing line with batch processors[J].International Journal of Flexible Manufacturing Systems,1999,11 (4):327-351.
  • 5ERRAMILLI V,MASON S J.Multiple orders per job batch scheduling with incompatible jobs[J].Annals Operation Research,2008,159 (1):245-260.
  • 6WANG Chengshuo,UZSOY R.A genetic algorithm to minimize maximum lateness on a batch processing machine[J].Computer & Operation Research,2002,29(2):1621-1640.
  • 7GONG H,TANG Lixin,DUIN C W.A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times[J].Computers & Operations Research,2010,37(5):960-969.
  • 8WANG Huimei,CHOU F D.Solving the parallel batch-processing machines with different release times,job sizes,and capacity limits by metaheuristics[J].Expert Systems with Applications,2010,37(2):1510-1521.
  • 9ZHENG Rui,LI Hongyu.Minimizing total weighted completion time on a batch-processing machine with re-entrance[C] //Proceedings of the IEEE International Conference on Automation and Logistics.Washington,D.C.,USA:IEEE,2009:1791-1794.
  • 10WANG Chengshuo,UISOY R.A genetic algorithm to minimize maximum lateness on a batch processing machine[J].Computers and Operations Research,2002,29(12):1621-1640.

共引文献5

同被引文献13

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部