平班水电厂400V厂用电系统优化配置

Optimization of 400V Auxiliary Power Supply System for Pingban Hydropower Station
下载PDF
导出
摘要 发电厂厂用电应保证对厂用负荷可靠和连续供电,使发电厂主辅设备安全运转,接线应能灵活地适应正常、事故、检修等各种运行方式要求。文章介绍平班水电厂厂用电的布置方式及设计中存在的薄弱环节,提出了不同的优化配置方案,通过对方案进行技术经济比较,最终使用了合理可行的方案进行优化配置,经运行观察达到了预期的效果。 The auxiliary power supply shall guarantee the reliable and continuous supply for all auxiliary loads so as to make all equipments run safely. Its wiring shall be fit to all kinds of operating requirements such as normal running, emergency and maintenance. This paper makes sign of auxiliary power supply, and proposes different comparisons, the most reasonable and feasible scheme practical running. an introduction to the layout and bottlenecks in the de- optimization schemes. Through technical and economic is chosen and the desired results are obtained through
作者 余登举
出处 《红水河》 2012年第3期70-73,共4页 Hongshui River
关键词 厂用电 可靠性 黑启动电源 优化 配置 平班水电厂 auxiliary power supply reliability black-start power supply optimization configuration Pingban hy-dropower station
  • 相关文献

参考文献1

  • 1GB7251--1997.低压成套开关设备和控制[S].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部