龙江水电站机组启动试运行的组织管理综述

Brief Introduction to Organization and Management of Commissioning of Longjiang Hydropower Station
下载PDF
导出
摘要 主要从机组启动试运行的准备、建立组织机构、试运行场地规划布置、试运行规章制度的建立、编制安全措施与应急预案、试运行过程中的主要问题及处理几个方面介绍了龙江水电站水轮发电机组的启动试运行组织管理工作,可供同类机组启动试运行参考。 The paper makes an introduction to the organization and management works ot commissiomng test on hydro-generator units of Longjiang hydropower station, which include preparations for commissioning test, organi- zation establishment, planning layout of commissioning site, establishment of commissioning regulations and com- pilation of safety measures and emergency plans, as well as treatment on problems encountered during commis- sioning. It can be referenced by similar units on commissioning tests.
出处 《红水河》 2012年第3期77-80,共4页 Hongshui River
关键词 水轮发电机组 试运行 组织机构 龙江水电站 hydro-generator units commissioning organizations Longjiang hydropower station
  • 相关文献

参考文献1

  • 1范方武,曾洪富,杨涛.龙滩水电站机组启动试运行的组织管理[J].水电站机电技术,2008,(1):87.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部