摘要
介绍新钢热连轧厂生产产能的制约瓶颈,通过对生产节奏、运输节奏的合理控制,降低粗轧区温降,最大化地满足生产,发挥产能潜力,顺利完成生产目标.
The bottleneck limiting the hot strip rolling production capacity of Xinyu Iron and Steel Co. is introduced, and then the measures of attaining the production tasks by properly controlling the production and transport speeds, reducing the temperature drop during rough rolling, maximizing the production quota, and exploring the production potential, are suggested.