摘要
通过对新钢三期技改工程中的计算机网络系统进行开发与应用,实现了新钢计算机网络系统的安全和可靠,保障了三期工程相关工序的生产、发货、检验、计量等管理工作的正常运行。
Through the development and application for computer network of third term project in Xinyu Steel, the safety and reliability is achieved and the normal operation of relative process management such as production, delivery, inspection and measure- ment are guaranteed.
出处
《江西冶金》
2012年第3期36-39,共4页
Jiangxi Metallurgy