55 m整节PHC管桩生产时,用2×75 t双联行车把钢模吊至离心机,再吊至蒸养池的过程中,为保证钢模直线度变形量尽可能小,需要设计2×75 t行车扁担梁吊具。
In 55 m entire section of PHC pile production process, 2 x 75 t double-lane winches steel mold to the centrifuge, and then it winches to the steam curing pool,we design a2 x 75t traffic pole beam spreader in order to ensure the steel mold deform as small as possible.
出处
《企业技术开发》
2012年第6期71-72,共2页
Technological Development of Enterprise
关键词
55
m整节PHC管桩
扁担梁
钢模变形
55 m entire section of PHC pile
pole beams
steel deformation