详细介绍了无烟气旁路、无GGH的湿法脱硫技术全国首批次在景德镇发电厂2×660 MW机组的应用,实际验证并肯定了该技术的工业使用价值,并从设计、安装、运行维护和管理等方面入手,详细阐述了保证系统安全运行的具体措施。
The application of wet flue gas desulphurization without gas bypass and GGH was introduced in 2 x660MW unit of Jingdezhen Power Plant. The result showed that the industrial value of the technology. Also, measures to ensure safety operation were described from design, installation, maintenace and management.