摘要
介绍利用矿区吊车,对75T/H煤泥硫化床锅炉大面积地面预组合,整体安装施工工艺,在安全、质量、工期、效益等方面均取得良好效果。
An introduction to that a coal area crane was used to lift the big pieces of the boiler and pre-assembled on the ground, and installed with complete body. The process had a good result in the aspects of safety, work period and efficiency.
出处
《煤矿现代化》
2000年第2期23-24,共2页
Coal Mine Modernization
关键词
大面积地面组合
整体安装
煤泥硫化床锅炉
锅炉
middle pressure & middle capacity, large pieces assembly on the ground, complete installation.