摘要
对彭家岩水电站压力管道滑坡治理工程进行了分析总结。实践证明,根据彭家岩水电站工程地质条件和滑坡机理分析,所采取的完善排水、外封内排,卸荷减载、稳定坡脚,下挡上护、灌桩支撑的工程治理技术措施是有效的,通过综合治理保障了电站的安全可靠运行。
Pressure pipeline landslide control project in Pengjiyan Hydropower Station was analyzed and summarized. Practice has proved that according to the geological conditions and landslide mechanism analysis of the Pengjiayan hydropower station project, the engineering control technique measures adopted for improving drainage, internal sealing and external drainage, unloading load shedding, lower baffle and upper protection, and pile filling support were effective, and the safe and reliable operation of the power station was guaranteed through comprehensive management.
出处
《中国水能及电气化》
2012年第7期33-35,共3页
China Water Power & Electrification
关键词
水电站
压力管道
滑坡治理
hydropower station
pressure pipeline
landslide treatment