彭家岩水电站压力管道滑坡治理技术 被引量:3

Landslide Treatment Technique of Pressure Pipeline in Pengjiayan Hydropower Station
下载PDF
导出
摘要 对彭家岩水电站压力管道滑坡治理工程进行了分析总结。实践证明,根据彭家岩水电站工程地质条件和滑坡机理分析,所采取的完善排水、外封内排,卸荷减载、稳定坡脚,下挡上护、灌桩支撑的工程治理技术措施是有效的,通过综合治理保障了电站的安全可靠运行。 Pressure pipeline landslide control project in Pengjiyan Hydropower Station was analyzed and summarized. Practice has proved that according to the geological conditions and landslide mechanism analysis of the Pengjiayan hydropower station project, the engineering control technique measures adopted for improving drainage, internal sealing and external drainage, unloading load shedding, lower baffle and upper protection, and pile filling support were effective, and the safe and reliable operation of the power station was guaranteed through comprehensive management.
作者 李文钦
出处 《中国水能及电气化》 2012年第7期33-35,共3页 China Water Power & Electrification
关键词 水电站 压力管道 滑坡治理 hydropower station pressure pipeline landslide treatment
  • 相关文献

参考文献2

  • 1刘启钊.水电站[M].北京:中国水利水电出版社,2006.
  • 2SL281-2003,水电站压力钢管设计规范[S].北京:中国水利水电出版社,2003.

共引文献8

同被引文献13

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部