期刊文献+

印度某2×660MW超临界燃煤电厂汽轮机主机选型 被引量:1

Turbine Selection of 2×660 MW Supercritical Coal Fired Power Plant in India
原文传递
导出
摘要 结合印度电力监管委员会(central electricity authority,CEA)的2010版电站设计导则,依托印度某2×660MW超临界电站工程,对国内三大动力厂(上海汽轮机有限公司、东方汽轮机厂及哈尔滨汽轮机厂)的汽轮机主要技术特点进行分析总结,通过对机组优选的凝汽器背压进行技术经济比较,最后得出对于印度工程,600MW级机组均为基本负荷机组,机组设计背压定义为9.5kPa时经济性优于10.13kPa。研究结论供后续印方业主设计咨询项目参考和借鉴。 Based on a 2×660 MW supercritical power plant in India, this paper analyzed the main technical features of three turbine manufactory in china (Shanghai steam turbine Co. , Ltd. , Dong Fang steam turbine works and Harbin steam turbine factory ), combined with the Power Plant Design Guidelines (2010) formulated by India Central Electricity Authority Regulations. Through the technical & economical comparison of condense back pressure, the results show that the 600 MW class unit in India is base load in the grid, and the back pressure of condenser design as 9. 5 kPa is better than 10. 13 kPa. The research results can possesses reference meaning for the future design consultation project in India.
作者 刘建强
出处 《电力建设》 2012年第7期54-57,共4页 Electric Power Construction
关键词 印度电厂 660 MW超临界汽轮机 设备选型 power plant in India 660 MW supercritical steam turbine equipment selection
  • 相关文献

参考文献8

  • 1李韩房,谭忠富.印度电力市场化改革概况[J].华东电力,2007,35(7):91-94. 被引量:4
  • 2张新闻.印度电力建设市场的问题及前景分析[J].中国电力教育(中),2010(11):235-237. 被引量:5
  • 3董和平,倪海,程波,等.印度电力建设市场展望[J].电力勘测没计,2009(6):8-13.
  • 4郭伟华.印度火电工程电站物资出口贸易风险分析[J].电力建设,2008,29(6):68-71. 被引量:2
  • 5Government of India Ministry of Power Central Electricity Authority. Central electricity authority (construction of electrical plants & electric lines) regulations [S]. New Delhi : CEA, 2010.
  • 6Shanghai Electric Group Co. Ltd. Technical description for super- critical ( 24. 2/566/600 ) 660 MW steam turbine [ R ]. Shanghai : Shanghai Electric Group Co. Ltd. , 2012.
  • 7Dongfang Electric Corporation Limited. Technical description for super-critical (24. 2/566/600)660 MW steam turbine[R]. Deyang: Dongfang Electric Corporation Limited, 2012.
  • 8Harbin Turbine Company Limited. Technical tender of turbine for 2 ×660 MW Chhattisgarh project [ R ]. Harbin: Harbin Turbine Company Limited, 2012.

二级参考文献15

  • 1胡济洲,奚江惠,胡隆基.发展中国家的电力市场化改革综述——市场模式、约束条件及路径选择[J].电力技术经济,2005,17(5):16-20. 被引量:1
  • 2Kumar Amitav Chaliha,indian Electricity: Miles to go[DB/OL]. [www.kwrintl.com/library/2007/indianelectricity.htm.
  • 3India envisages about 950,000 MW power requirement by 2030[DB/OL].www. monstersandcrit ics.com/news/energywatch/.
  • 4Highlights of power sector[DB/OL].www.cea.nic.in/power_ sec_reports/executive_summary/2008_12/1-2. pdf.
  • 5Electricity sector in India[DB/OL].http.//asian-power com/ rental/feature/electricity-sector-in-india.
  • 6Electricity sector in India[DB/OL] http.//en wikipedia.org/ wiki/Electricity_sector in India.
  • 7萨莉·亨特.电力市场竞争[M].北京:中信出版社,2004..
  • 8国家电力监管委员会.中国电力市场名词解释[M].北京:中国电力出版社,2005.
  • 9http://www.nrldc.org/.
  • 10http://www.cercind.ors/.

共引文献8

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;