基于meta-analysis和等级全息建模的可信软件开发风险识别研究 被引量:5

Risk Identification Research for Trustworthy Software Development Using Meta-Analysis and Hierarchical Holographic Modeling
原文传递
导出
摘要 对软件开发过程中的风险进行有效识别,是提升软件可信性的重要方法和手段.本文以面向可信的软件开发过程风险辨识为研究对象,采用meta-analysis方法,结合软件项目开发风险相关的文献,采取高频词提取的方法,得出了前20大风险,并对需求、用户、供应商等前10大风险进行了重点阐述.给出了可信软件风险识别的等级全息框架,以产品、项目管理、项目结果、属性等10个视角全息辨识可信软件开发过程中可能面临的风险,与等级可变的不同风险情景识别过程相结合,为可信软件的风险识别构建了系统的解决思路和框架. To identify all the risks in software development is an important strategy to improve the trustworthiness softwares. This paper discussed the development of risk identification for trustworthy software. Relative literatures about software project risk were collected using meta-analysis and top 20 risks were extracted from risk descriptions according to the frequency sequence. The top 10 risks were described, including requirement risk, user risk, supplier risk etc. Hierarchical holographic modeling containing 10 subcategories like product, project management, project result, attribute etc was presented to identify all risks in trustworthy software development. Combined with the altera ble sub framework for different risk scenes, we presented a systemic solution framework for risk identification in trust- worthy software development.
出处 《武汉大学学报(理学版)》 CAS CSCD 北大核心 2012年第3期260-268,共9页 Journal of Wuhan University:Natural Science Edition
基金 国家自然科学基金重大研究计划重点项目(90718042) 中国博士后基金(20090450588)
关键词 可信软件 风险识别 等级全息建模 META-ANALYSIS 风险管理 trustworthy software risk identification hierarchical holographic modeling meta-analysis risk management
  • 相关文献

参考文献61

  • 1刘克,单志广,王戟,何积丰,张兆田,秦玉文.“可信软件基础研究”重大研究计划综述[J].中国科学基金,2008,22(3):145-151. 被引量:136
  • 2Boehm B W. Software risk management-principles and praetices[J]. 1EEE Software, 1991,8( 1 ) : 32-41.
  • 3HallEM.风险管理一软件系统开发方法[M].北京:清华大学出版社,2002.
  • 4Haimes Y Y. Hierarchical holographic modeling[J]. IEEE Transactions on Systems, Man and Cybernetics, 1981,11(9) :606-617.
  • 5Haimes Y Y. Risk Modeling, Assessment, and Man-agement [M]. New Jersey:Wiley Sons, Inc, 2008.
  • 6Chittister C, Haimes Y. Risk associated with software development:A holistie framework for assessment and management [ J ]. IEEE Transactions on Systems, Man, and Cybernetics,1993,23(3) :710-723.
  • 7Kaplan S, Haimes Y, Garrick B. Fitting hierarchical holographic modeling into the theory of scenario struc- turing and a resulting refinement to the quantitative definition of risk[J]. Risk Analysis, 2001,21 ( 5 ) : 807- 815.
  • 8马丽仪,邱菀华,杨亚琴.大型复杂项目风险建模与熵决策[J].北京航空航天大学学报,2010,36(2):184-187. 被引量:10
  • 9陈天平,郑连清,张新源.HHM在信息系统风险识别中的应用[J].中国安全生产科学技术,2008,4(6):98-100. 被引量:17
  • 10Barki H, Rivard S, Talbot J. Toward an assessment of software development risk[J]. Journal of Manage- ment Information Systems, 1993,10(2) : 203-225.

二级参考文献6

  • 1Hamimes Y Y.风险建模、评估和管理[M].胡平,译.2版.西安:西安交通大学出版社,2007:84-86,267-276.
  • 2Haimes Y Y. Hierarchical holographic modeling [ J ]. IEEE Transactions on Systems, Man, and Cybernetics, 1981 (9) :606 - 617.
  • 3Haimes Y Y, Lambert J, Li Duan, et al. Hierarchical holographic modeling for risk identification in complex systems [ C ]//Proceedings of the IEEE International Conference on Systems, Man and Cybernetics. Piscataway, NJ : IEEE, 1995,2 : 1027 - 1032.
  • 4ChanKong V, Haimes Y Y, Rosenkranz H S, et al. The carcinogenicity prediction and battery selection ( CPBS ) method : A Bayesian approach[ J ]. Mutation Research, 1985 ( 153 ) : 135 - 166.
  • 5邱菀华.管理决策与应用熵学[M].北京:机械工业出版社,2001..
  • 6周荣喜,刘善存,邱菀华.熵在决策分析中的应用综述[J].控制与决策,2008,23(4):361-366. 被引量:35

共引文献159

同被引文献51

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部