摘要
在超长、超大水池后浇带施工过程中,改变通常预埋止水带、预留止水槽的做法,采用在池壁、池底的迎水面上粘贴橡胶止水带的构造止水施工方法,达到了良好的止水效果。
The structure water stop method by use of rubber water stop band affix on the wall and bottom of the pool which is contact with water to instead of embedded water stop band and preformed water stop flume method during construction of super long and super large pool post-casting band, and gained good effect of water stop.