某输电塔横担变形断裂破坏探讨 被引量:1

Discussion on Deformation and Breakage of Cross Arm of Transmission Tower
下载PDF
导出
摘要 根据某输电塔横担断裂破坏的事故情况,采用一阶弹性计算模型,通过对断裂角钢局部和整体进行分析,找出事故主要原因为施工起吊位置选择不当,改变了输电塔的传力途径和受力模型;提出在输电铁塔施工过程中避免类似事故的针对性建议。 Aiming at breakage of cross arm of transmission tower, the paper finds out that the accident is mainly caused by wrong choice of lifting position by means of calculation model for first-order elasticity and locally and integrally analyzing the broken angle iron; it changes the way of force transmission and stress model and proposes some suggestions preventing such accident during construction of transmission towers.
出处 《广东电力》 2012年第6期51-53,58,共4页 Guangdong Electric Power
关键词 输电塔横担 导线起吊 施工孔 cross arm wire lifting working hole
  • 相关文献

参考文献4

  • 1王振华,金晓华,弓国军.一次输电塔横担破坏事故有限元分析[J].广东输电与变电技术,2010,12(4):48-50. 被引量:2
  • 2GB50017-2003.钢结构设计规范[S].[S].,..
  • 3DL/T5154-2002.架空送电线路杆塔结构设计技术规定[S].[S].,..
  • 4DL5009--2004,电力建设安全工作规程(架空电力线路部分)[S].