期刊文献+

改进铜坑锡矿分段空场嗣后充填采矿法的设想 被引量:2

A Tentative Plan for the Improvement of Sublevel Open Stoping with Subsequent Backfilling at Tongkeng Tin Mine
下载PDF
导出
摘要 铜坑锡矿采用一步骤采场和二步骤采场宽度相同的分段空场嗣后充填采矿法开采 ,其胶结充填量占总充填量的 50 %。作者提出改进方案 :用较小尺寸布设需胶结充填的一步骤采场 ,用较大尺寸布设非胶结充填的二步骤采场。这样可达到减少胶结充填量 。 The deposit at Tongkeng Tin Mine is exploited by sublevel open stoping with subsequent backfilling,the width of the first-step and second-step stopes is the same and the volume of cemented fill accounts for 50% of total backfill.The authors put forward an improving scheme i.e. arrange the first-step stopes with smaller size for cemented filling and the second-step stopes with larger size for noncemented filling,so as to reduce the volume of cemented fill and cut down the cost of backfilling.
出处 《矿业研究与开发》 CAS 2000年第3期16-18,共3页 Mining Research and Development
关键词 铜坑 锡矿 分段空场 嗣后充填采矿法 Sublevel open stoping with subsequent backfilling Width of stope Volume of filling
  • 相关文献

同被引文献98

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部