摘要
石油库和加油站工程的施工管理是一项综合性、专业性很强的工作,要做好此项工作,必须把握住施工队伍选择、加强安全教育培训、签订施工安全协议和加强现场监管四个关节点。
The management and control of oil depot and gas station construction is a comprehensive,professional task,which need four key points to be grasped including selection of construction team,strengthening safety education and training,signing an agreement on construction safety,and forcing the site management.
出处
《石油库与加油站》
2012年第3期26-28,1,共3页
Oil Depot And Gas Station
关键词
石油库
加油站
施工管理
oil depot,gas station,project management