摘要
沈阳市府恒隆广场项目11 m厚筏板大体积混凝土采用蓄水养护的施工工艺。采用了测温点监测温度同时保持蓄水深的方法,根据监测数据绘制养护过程的混凝土及周围环境温度分析图,证明蓄水养护的方法能保证混凝土内外温差不致过大。
The technology of the water conservation is used for the mass concrete construction of 1 lm thick raft board in the Shenyang City Hang Lung Plaza Project. The method is used that temperature measuring point monitores temperature while maintaining the water depth. According to the analysis drawned to the monitoring data during the maintenance of concrete and the temperature of the surrounding environment. The method can ensure that temperature difference is too large inside and outside of the concrete.
出处
《建筑技术开发》
2012年第7期48-50,84,共4页
Building Technology Development
关键词
厚筏板
蓄水养护
温控
thick raft
water conservation
temperatrue control