7CHUA D K H, GOH Y M. Incident causation model for improving feedback of safety knowledge [J]. Journal of Construc- tion Engineering and Management, 2004, 30(4) : 524-551.
8CHOI H H, CHO H N, SEO J W. Risk assessment methodology for underground construction projects [ J]. Journal of Con- struction Engineering and Management, 2004, 130(2) : 258-272.
9SONG XIAOQIANG, SONGPING, ZHOU DONGSHENG, et al. The LEC method's application to risk assessment manage- ment system in the power supply enterprise [ C] //Proceedings of 2011 International Conference on Management Science and Intelligent Control (ICMSIC 2011 ), Anhui: Anhui University of Economics and Finance, 2011.