摘要
通过分析穿岩洞矿段露天采矿场排土制约因素,提出利用大型设备强化分区开采,创造内部排土条件,解决剥离岩土排弃的难题,介绍了强化分区开采的实施措施。
Intensified sectional mining is made by using heavy equipment with analysis of the constraint factor of dumping in open air stope of Chuanyandong Section to create conditions of internal waste rocks dumping and to deal with the problem of stripped rock and soil dumping, and measures to conduct intensified sectional mining are presented.
出处
《化工矿物与加工》
CAS
北大核心
2012年第7期33-34,共2页
Industrial Minerals & Processing
关键词
露天开采
强化分区
内部排土场
open pit mining intensified sectional mining,internal waste dump