在严寒地区,建筑工程组织冬季施工,可以加快施工进度,缩短工程建设周期;混凝土工程在极限气温不低于-15°C、平均气温不低于-5°C时,采用综合蓄热法进行混凝土冬季施工,投入费用不多,措施简单可行。本文通过就其工程混凝土在冬季施工表面温度实测及分析进行论述,仅供参考。
In cold areas, construction in winter can accelerate the progress of construction and shorten the construction cycle; the limit temperature of concrete works can not lower than -15℃, and the average temperature can not below -5℃. If use the integrated heat storage method in concrete construction in winter, the cost of inputs is less and the measures are simple and feasible. Surface temperature measurement and analysis of the concrete construction in winter are discussed for reference only.