期刊文献+

综合蓄热法混凝土冬季施工表面温度实测及分析

Surface Temperature Measurement and Analysis of Concrete Construction in Winter by Integrated Heat Storage Method
下载PDF
导出
摘要 在严寒地区,建筑工程组织冬季施工,可以加快施工进度,缩短工程建设周期;混凝土工程在极限气温不低于-15°C、平均气温不低于-5°C时,采用综合蓄热法进行混凝土冬季施工,投入费用不多,措施简单可行。本文通过就其工程混凝土在冬季施工表面温度实测及分析进行论述,仅供参考。 In cold areas, construction in winter can accelerate the progress of construction and shorten the construction cycle; the limit temperature of concrete works can not lower than -15℃, and the average temperature can not below -5℃. If use the integrated heat storage method in concrete construction in winter, the cost of inputs is less and the measures are simple and feasible. Surface temperature measurement and analysis of the concrete construction in winter are discussed for reference only.
出处 《价值工程》 2012年第23期119-120,共2页 Value Engineering
关键词 混凝土 冬季施工 蓄热法 实测 温度 concrete winter construction storage method measurement temperature
  • 相关文献

参考文献6

二级参考文献20

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部