摘要
研究了 Job Shop类型柔性制造系统的调度问题 ,其中每个工件都有多个可替代的工艺计划 ,并且每个操作均可在多个机器上选择加工 .建立了多目标混合整数规划模型 ,并设计了一种启发式算法进行求解 .实践表明 。
The problem of scheduling parts in job shop type flexible manufacturing systems is investigated when each part can have alternative process plans and each operation of a part can be performed on alternative machines.The multiple objective mixed integer programming model is developed and solved by the proposed heuristic algorithm.The results indicate that the proposed algorithm can obtain satisfactory solutions of the problems.
出处
《天津大学学报》
EI
CAS
CSCD
2000年第2期227-230,共4页
Journal of Tianjin University(Science and Technology)