摘要
结合工程实例,论述了天然气管道水平定向钻穿越圆砾层、卵石层、局部溶洞区等复杂多变地层的设计方案与施工方法。
The design scheme and construction method of natural gas pipeline horizontal directional drilling crossing in complex stratum area such as rounded gravel layer, pebble layer and local limestonecave area are discussed with an engineering example.
出处
《煤气与热力》
2012年第7期25-31,共7页
Gas & Heat
关键词
水平定向钻穿越
圆砾层
卵石层
溶洞区
horizontal directional drilling crossing
rounded gravel layer
pebble layer
limestone cave area