摘要
本文在总结试点工程BL电厂主要辅机单列配置设备选型情况的基础上,对600MW等级机组电厂主要辅机单、双列配置的设计制造能力、运行可靠性、综合技术经济性等方面进行了论证分析,并提出了相关的结论和建议,供业内同行参考。
Based on the summarization about selection of main auxiliary equipment with single row configuration in BL power plant pilot project,this article demonstrates and analyzes the auxiliary equipment with single and double row configuration in 600MW power plant,in terms of design and manufacture capability,operation reliability and comprehensive technical economy,and puts forward relevant conclusions and recommendations for reference.
出处
《电力勘测设计》
2012年第3期34-37,共4页
Electric Power Survey & Design
关键词
单列配置
制造能力
技术经济性
设备投资
single row configuration
manufacturing capacity
technical economy
equipement investment