三维数字化移交在青藏直流工程中的应用研究 被引量:9

Application of 3D Digital Handover to DC Project in Qinghai-tibet
下载PDF
导出
摘要 青藏直流工程所经区域平均海拔4500m,最高海拔达5300m,还要穿越长约500km多年冻土区,是世界上在这种海拔高度上运行线路最长、施工难度最大的输电线路工程。作为国家重点工程,国家电网公司以打造精品工程为目标,积极推动三维数字化移交应用。通过该项应用研究,提供了一个统一规范的三维数字化平台,节省了软件开发及海量数据建设费用。该项应用研究是基建标准化的集中体现,是智能电网统一标准、统一建设的具体应用,是提高跨区电网建设精益化管理水平的集中体现。 The average altitude of the Area passed by Qinghai-Tibet DC Project?is 4500 m,and the maximum altitude is about 5300 m,the project also pass through permafrost regions of about 500 km,it is the world's?longest,?the most difficulty construction transmission?line project running in such high altitude.As a national key project,State Grid Corporation actively promoted the Application of 3D digital handover to create fine works.Through the Applied Research,it provides a accordant standardized 3D digital platform,saving huge amounts investment in software development and data construction.The Applied Research is the concentrated expression of infrastructure standardization,it is the specific application of the Smart Grid unified standards and unified construction,it is the concentrated expression of raising lean management level of large interconnected power construction.
出处 《电力勘测设计》 2012年第3期62-65,共4页 Electric Power Survey & Design
关键词 三维数字化移交 青藏直流 统一标准 智能电网 3D digital handover Qinghai-Tibet DC Project accordant standard Smart Grid
  • 相关文献

参考文献5

二级参考文献17

共引文献65

同被引文献65

引证文献9

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部