火力发电厂电缆设计优化与施工管理 被引量:1

Cable Optimization Design and Construction Management in Thermal Power Plant
下载PDF
导出
摘要 针对火力发电厂电缆设计、施工过程中存在的电缆布置方式不当、电缆材料和规格选型偏保守、电缆桥配置不合适,以及施工管理等方面存在的问题,结合神华内蒙古国华呼伦贝尔发电有限公司一期工程的实际情况,通过采取严格控制电缆长度、合理安排电缆走向、科学选取电缆材质和截面积等手段,对电缆设计进行了优化并提出了建议。提出了电缆现场施工管理的具体措施。 In power plant cable design and construction process, existed cable arrangement undeserved, cable materials and specifications selection conservative, cable bridge configuration not suitable, and construction management problems. Combined with the actual situation of the first phase project in Shenhua Inner Mongolia Guohua Hulunbeier Power Limited Company, by taking the measures of strict control the cable arrangement reasonable length, reasonable arrangement of cable direction, scientificly selection of cable material and cross sectional area, the design was optimized, put forward the cable construction site manazement measures.
出处 《内蒙古电力技术》 2012年第3期69-72,共4页 Inner Mongolia Electric Power
关键词 电缆 电缆沟 电缆桥 电缆线芯截面 电缆设计 cable cable trench cable bridge cable core section cable construction
  • 相关文献

参考文献4

  • 1中国电力企业联合会.GB50217-2007电力工程电缆设计规范[S].北京:中国计划出版社,2008:5-10.
  • 2电力行业规划设计标准化技术委员会.DL/T5182-2004火力发电厂热工自动化就地设备安装、管路及电缆设计技术规定[S].北京:中国电力出版社,2004:90-98.
  • 3国家电力公司.防止电力生产重大事故的二十五项重点要求[M].北京:中国电力出版社,2000.
  • 4中国电力规划设计协会.DL5000-2000火力发电厂设计技术规程[S].北京:中国电力出版社,2000:71-73.

共引文献19

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部