摘要
车辆段与综合基地的设计是多专业互相配合的系统工程。通过夏南车辆段与综合基地设计及配合施工情况,着重从专业接口、总图协调、综合管线、技术管理和配合施工等多个方面阐述了设计体会。针对设计中出现的问题总结了经验和教训,并给出了相关建议。
The design of depot and a multi-purpose base needs cooperation of different majors, so it is defined as a system engineering. Through expositing the design of Xi- anan Depot and Multi-purpose Base, which covers major interfaces, lay-out, complex pipeline, technical manage- ment and construction coordination, the experiences and lessons are summarized, suggestions are proposed for the depot and multi-purpose base design. Key words Guangzhou-Foshan Line; depot and multi-pur- pose base; engineering design
出处
《城市轨道交通研究》
北大核心
2012年第7期101-104,共4页
Urban Mass Transit
关键词
广佛线
车辆段与综合基地
工程设计
Guangzhou-Foshan Line
depot and multi-pur-pose base
engineering design