摘要
就数据机房供电系统设计,提出以下几个问题供同行探讨:①有源电力滤波装置的设置;②UPS配电柜进线开关的设置;③手动检修旁路的设置;④B级机房UPS进线柜中带旁路ATSE的设置。
Following questions about design for power supply system of data room are presented for discussion: ① settings of active power filter; ② settings of input switch of UPS power distribution cabinet; ③ settings of manual repair bypass; ④ settings of bypass ATSE in UPS incoming-line cabinet of grade B room.
出处
《建筑电气》
2012年第7期11-15,共5页
Building Electricity
关键词
数据中心
B级机房
有源电力滤波装置
UPS配电柜
手动检修旁路
ATSE
Data center Grade B room Activepower filter UPS distribution cabinet Manual repairbypass Automatic transfer switching equipment