期刊文献+

基于改进蚁群算法的项目组合工期——成本优化的研究 被引量:4

Research on Time-cost Trade-off of Project Portfolio Based on Improved Ant Colony Algorithm
下载PDF
导出
摘要 基于企业战略导向的项目组合工期——成本优化问题是企业进行多项目管理时需要解决的重要问题,对企业资源效益最大化发挥起到关键作用,它从本质上属于多目标优化问题。本文将蚁群算法引入项目组合工期——成本优化问题的求解,并针对蚁群算法存在的早熟、停止、局部最优的缺点,提出与混沌结合的改进蚁群算法,引进确定和不确定性搜索规则。实验结果表明,改进的蚁群算法能够有效地提高蚁群算法的全局寻优能力,对工期——成本优化问题的求解能够得出比较好的结果。 The time-cost trade-off based on the strategic orientation is one of the most crucial aspects of enterprise project portfolio planning that plays a key role in enterprise resources benefit maximization, which in fact is a multi-objective optimization prob- lem. A new evolutionary algorithm-ant colony optimization (ACO) algorithm is employed to solve the time-cost trade-off problem. According to the ant colony algorithm existing precocious, stagnation, local optimal shortcomings, adopting certainty and uncertainty search rules and combining with chaos, an improved ant colony algorithm is proposed. Experimental results indicate that join chaos and search rules, the developed ACO can effectively improve global optimization ability, can draw better resLdts in sol- ving time-cost trade-off of project nortfolio.
出处 《计算机与现代化》 2012年第7期9-13,共5页 Computer and Modernization
基金 国家自然科学基金资助项目(71172123) 西北工业大学人文社科与管理振兴基金资助项目(RW201105)
关键词 工期——成本优化 蚁群算法 项目组合 time-cost trade-off ant colony algorithm project portfolio
  • 相关文献

参考文献18

  • 1Mendesa J J M, Gonclvesb J F, Resendec M G C. A random key based genetic algorithm for the resource constrained project scheduling problem [ J ]. Computers & Operations Research, 2009, 36(1) :92-109.
  • 2Vicente Vails, Francisco Ballestin, Sacramento Quintanilla. A hybrid genetic algorithm for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2008,185 (2) :495-508.
  • 3Hartmann S. A self-adapting genetic algorithm for project scheduling under resource constraints [ J ]. Naval Research Logistics, 2002,49(5) :433-448.
  • 4Jirachai Buddhakulsomsiri, David S Kim. Priority rule-based heuristic for multi-mode esource-constrained project scheduling problems with resource vacations and activity splitting [J]. European Journal of Operational Research, 2007,178 (2) : 374-390.
  • 5Kolisch R, Hartmann S. Experimental evaluation of heuristics for the resource constrained project scheduling: An up-date [ J ]. European Journal of Operational Research, 2006,174( 1 ) : 23-47.
  • 6Yazdani M, Amiri M, Zandieh M. Flexible job-shop scheduling with parallel variable neighborhood search algorithm [J]. Expert Systems with Applications, 2010,37(1) :678-687.
  • 7Xu Ningxiong, Sally A McKee, Linda K Nozicka, et al. Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem [J]. Computers & Operations Research, 2008,35 (10) :3284-3297.
  • 8Kurtulus I, Narola S C. Multi-project scheduling: Analysis of project performance [ J ]. IIE Transactions, 1985, 17 ( 1 ) :58-66.
  • 9Tsai D M, Chiu H N. Two heuristics for scheduling multiple projects with constraints[ J ]. Construction Management and Economies, 1996,14 (4): 325-340.
  • 10寿涌毅.多项目资源配置的拉格朗日分解方法[J].数量经济技术经济研究,2004,21(8):98-102. 被引量:13

二级参考文献37

  • 1赵凤新,胡聿贤.地震动非平稳性与幅值谱和相位差谱的关系[J].地震工程与工程振动,1994,14(2):1-6. 被引量:79
  • 2芦金婵,李乃成,王伟东.基于最佳进化方向的多目标遗传算法[J].计算机工程与应用,2005,41(19):73-76. 被引量:5
  • 3张利彪,周春光,刘小华,马铭.粒子群算法在求解优化问题中的应用[J].吉林大学学报(信息科学版),2005,23(4):385-389. 被引量:39
  • 4邹振宇,江全元,张鹏翔,曹一家.PSS与SVC多目标协调设计[J].电力系统及其自动化学报,2005,17(4):66-70. 被引量:9
  • 5李英民.[D].重庆:重庆建筑大学,1999.
  • 6.GB5001 1-2001.建筑抗震设计规范[S].,..
  • 7HAN Jiawei, KAMBER Micheline. Data mining: concepts and techniques [ M]. San Fransisco: Morgan Kaufmann Publishers, 2001 : 383-466.
  • 8WANG Xin, HAMILTON H J. A comparative study of two density-based spatial clustering algorithms for very large datasets [ M ]. Berlin: Springer-Vedag GmbH, 2005, 3501 : 120-132.
  • 9SANDER Joorg, ESTER Martin, KRIEGEL Hanspeter, et al. Density-based clustering in spatial databases:the algorithm GDBSCAN and its applications [ J ]. Springer Netherlands, 1998, 2(2) :169-194.
  • 10CHEN Ling, XU Xiaohua, CI-IEN Yixin, et al. A novel ant clustering algorithm based on cellular automata[ C]// Proceedings of the IEEE/WIC/ACM International Conference on Intelligent Agent Technology ( IAT' 04 ). Beijing: IEEE Press, 2004: 148-154.

共引文献21

同被引文献55

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部