期刊文献+

山谷斜拉桥前支点挂篮拆除技术 被引量:2

Demolition Technique of Front Fulcrum Hanging Basket of Cable-stayed Bridge in the Valley
下载PDF
导出
摘要 文章根据某特大桥斜拉桥所处的山谷地形,对边跨挂篮采取千斤顶整体牵引下放,落地后分块拆除技术;对中跨挂篮采取原位解体,通过卷扬机分块牵引下落拆除技术。实践证明,以上技术安全可靠,经济节约,可供同类挂篮或高空重型悬吊物拆除施工参考。 According to the valley topography where the cable-stayed bridge locates,side-span hanging basket is lowered integrally by using the lifting jack and demolished partly after it reaches the ground,while middle-span hanging basket is dropped by electric hoister after being disintegrated in situ. It proves that this technique is safe, reliable and inexpensive, which would be a good reference for the demolishment of similar hanging baskets and other heavy suspensions in high attitude.
作者 饶智华 刘菁
出处 《现代交通技术》 2012年第3期37-40,44,共5页 Modern Transportation Technology
关键词 斜拉桥 前支点挂篮 拆除技术 cable-stayed bridge front fulcrum hanging basket demolition technique
  • 相关文献

参考文献1

  • 1刘吉士,张俊义,陈亚军.桥梁施工百问(第2版)[M].北京:人民交通出版社,2011.

同被引文献4

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部