介绍宁德市.盛辉仕林东湖大体积混凝土的温度控制方案、监测结果与分析。通过合理的原材料选择、配合比设计、施工部署等温度控制措施,对混凝土内部温度进行监测,并及时进行覆盖保温、洒水养护。对承台进行检查,发现并未产生任何的温度裂缝,达到了工程设计的要求。工程实践表明:对大体积混凝土承台,采取上述施工方法效果良好。
The temperature control program,monitoring results and analysis of large volume concrete of City of Ningde·Sheng Hui·Shilin East Lake were introduced in this paper.The internal temperature of the concrete was controlled by choosing reasonable raw materials,mix design,construction of the deployment,timely covering and water curing.The test results show that there were no crack existing in the mass concrete,which meet the design requirements.Engineering practices show that the construction methods above are the desired results to mass concrete.
出处
《福建建设科技》
2012年第4期70-71,84,共3页
Fujian Construction Science & Technology
关键词
大承台
大体积混凝土
温度控制
温度监测
Large cap
large volume concrete
temperature control
temperature monitoring