摘要
大伙房输配水工程三维仿真系统是在工程运行调度工况特别复杂的背景下建立的,其构架核心是SymLinkNJ14仿真数据库系统软件和PMC64仿真软件。本文通过阐述该三维仿真系统在大伙房输配水过程中成功的应用经验,为后续的长距离管道输水工程及跨流域水资源调配工程的仿真系统建设提供参考。
The 3D simulation system of water conveyance and distribution project of Dahuofang Reservoir is established under a background of a quite complicated operation condition, of which the core framework consists of the simulation database softwares of both SymLinkNJ14 and PMC64. The successful experiences from the application of the 3-D simulation system to the process of the water conveyance and distribution are described herein, so as to provide a reference for the construction of the simulation sys- tem of the following water conveyance project with long-distance pipeline and the inter-basin water resources allocation project in the days to come.