临近高压电塔隧道施工技术 被引量:2

Construction Technology for Tunnel with Adjacent High-Voltage Tower
下载PDF
导出
摘要 矿山法区间隧道临近高压电塔施工为小近距施工属于一级环境风险工程,为了避免地面作业对高压电塔的影响,对隧道施工采取洞内注浆加固综合措施。文章简要介绍砂卵石地层中,小近距临近高压电塔隧道洞内注浆加固施工技术措施、施工控制要点和施工工艺。 Boring method in the construction of section tunnel with adjacent high-voltage tower is an interruption work, and the construction is classified as an environmental risk project. In order to avoid ground operation impact on high-voltage tower, comprehensive measures have been taken inside tunnel including the grouting reinforcement in tunnel construction. The article briefly describes grouting reinforcement construction measures in sand and gravel strata for adjacent high voltage tower, key points for construction control and construction process.
出处 《现代城市轨道交通》 2012年第4期30-33,共4页 Modern Urban Transit
关键词 隧道 小近距 施工 技术 tunnel, adjacent, construction, technology
  • 相关文献

参考文献4

二级参考文献3

  • 1刘昌用.浅埋暗挖技术在北京地铁复兴门折返线施工中的运用[M].北京:中国铁道出版社,1988:189-190.
  • 2梁炯鋆.董淑棉、张学文,等.锚固与注浆技术手册:地下工程软弱围岩超前预支护[M].北京:中国电力出版社,1999:143-147.
  • 3贺长俊,蒋中庸,刘昌用,邹彪.浅埋暗挖法隧道施工技术的发展[J].市政技术,2009,27(3):274-279. 被引量:56

共引文献7

同被引文献12

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部