摘要 在盾构工程中盾构机选型是重点工作之一,盾构机型选择的正确与否是盾构隧道工程施工成败的关键。文章以北京地铁4号线四标段盾构工程为例,介绍了盾构机选型原则与依据,针对4号线四标段所处砂卵石地层特点,系统阐述了北京砂卵石地层盾构机选型的技术路线和过程。 Shield machine selection is one of the priorities in a shield project. Correct selection of shield model is a key to the success of the shield tunnel construction. Taking fourth tender lot for shield project of Beijing Metro Line 4 as an example, the paper introduces the principle and the basis for selection of shield machine model, and the characteristics of the sand and gravel strata in the tender lot section of Line 4 are analyzed. It systematically described the technical route for shield selection for sand and gravel strata and process of the shield machine selection.
出处 《现代城市轨道交通》 2012年第4期34-36,共3页 Modern Urban Transit
关键词 地铁 砂卵石地层 盾构 选型 metro, sand and gravel strata, shield, selection
  • 相关文献

参考文献3

  • 1全国一级建造师执业资格委员会.市政公用工程管理与实务[M].北京:中国建筑工业出版社,2011.
  • 2张风祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2004.
  • 3地铁设计规范GB50517-2003[S].北京:城建设计研究总院,2003.

共引文献37

同被引文献34

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部