摘要
框构桥顶进施工过程中由于地基处理不当或顶进中技术措施不到位,极容易出现扎头或扎尾问题,给施工造成很大的困难和影响。结合朔黄铁路K550+881处顶进桥施工中出现扎尾问题,分析了出现扎尾的原因,重点阐述了地基处理、梁体纠偏方案与工艺流程及施工过程中关键事项,为类似问题的处理提供借鉴经验。
In the frame bridge jacking construction process, due to improper technical measures taken for formation treatment or jacking, the problem of tie head or tie end is very often seen, which causes great difficulty to the construction and has adverse impact. Taking into consideration of the bar-end problem in the jacking bridge construction at the K550+881 of Shuohuang Railway line, the paper analyzes the cause of tie ends, and it mainly introduces the foundation treatment, the beam correction programs and key issues in the process and construction, providing reference experience to deal with similar problems.
出处
《现代城市轨道交通》
2012年第4期37-39,共3页
Modern Urban Transit
关键词
框构桥
顶进
扎尾
纠偏
frame bridge, jacking, tie end, correction