摘要
针对跨流域供水水库群联合调度存在的主从递阶结构,提出了调水规则和供水规则相结合的跨流域供水水库群联合调度规则。其中,调水规则由一组基于各水库蓄水量的调水控制线表示,根据其间的相对位置关系,决定是否调水,调水量如何分配等;供水规则由各库供水调度图表示,对应于不同用水户的限制供水线将水库的兴利库容分为若干调度区。建立了适合于主从递阶结构的水库群联合调度二层规划模型,采用并行种群混合进化的粒子群算法对模型进行求解。中国北方某大型跨流域调水工程的实例研究证明了模型的合理性和有效性。
In view of the Stackelberg structure of the multi-reservoir joint operation problem in inter-basin water transfer-supply project, this paper proposes a multi-reservoir joint operation policy, which consists of water transfer rule and water supply rule. In this study, a set of water transfer rule curves based on the storage of individual reservoir in the system is employed to illustrate the water transfer rule, which deter- mines the starting conditions of water transfer and the allocation of the transferred water. The water supply rule is presented using an operation chart, the hedging rule curves of which for each water user divide the reservoir active storage into several operation zones. Besides, this paper proposes a bi-level programming (BLP) model for the Stackelberg structure of the inter-basin muhi-reservoir joint operation problem, which includes the upper-level model for water transfer and the lower-level model for water supply. The improved particle swarm optimization algorithm is employed to solve the BLP model. An inter-basin water transfer project in North China is taken as the case study to verify the reasonability and validity of the model.
出处
《水利学报》
EI
CSCD
北大核心
2012年第7期757-766,共10页
Journal of Hydraulic Engineering
基金
国家自然科学基金项目(50979073
71171151)
武汉大学2008年博士研究生(含1+4)自主科研项目
武汉大学博士研究生短期出国(境)研修专项经费
教育部博士点基金项目(20100141110061)
关键词
跨流域调水
水库群
调
供水规则
二层规划
改进粒子群
inter-basin water transfer
muhi-reservoir
water-transfer and water-supply rule
the BLP model
improved PSO