期刊文献+

煤炭矿区规划环评与项目环评的衔接研究 被引量:2

Research on Combining EIA of Coal Mine Planning and Project
下载PDF
导出
摘要 煤炭矿区规划环境影响评价(以下简称矿区规划环评)与矿区内煤炭开发建设项目环境影响评价(以下简称煤矿项目环评)的衔接问题,一直是煤炭开发环境管理和环评机构关注的问题。将矿区规划环评与煤矿项目环评衔接起来,一方面可使矿区规划环评集中考虑战略层次的根本性问题;另一方面可以简化煤矿项目环评的过程,降低煤矿项目环评所需的时间和费用,从而提高环评工作的效率和有效性。矿区规划环评与煤矿项目环评可以从评价时间、评价内容以及决策三个途径进行衔接。 The problem of combining environmental impact assessment(EIA) of coal mine and that of coal mine construction project receives a lot of attention from the environmental protection bureau and EIA institutions. The combination of these two fields enables the EIA planning to pay more attention to strategic problems and simplified the assessment of construction projects in a bid to save time and cost. The efficiency and validity are improved by linking the two fields from the perspective of time arrange- ment, content and decision - making.
出处 《环境科学与管理》 CAS 2012年第8期163-166,共4页 Environmental Science and Management
关键词 煤炭矿区规划 煤炭开发建设项目 环境影响评价 衔接 coal mine planning coal mine construction project environmental impact assessment combination
  • 相关文献

参考文献6

  • 1祝兴祥,等.中国煤炭资源开发的生态环境影响与对策报告[A].煤炭开发建设项目生态环境保护研究与实践,环境保护部环评司,2006.
  • 2TherivelR. Strategic Environmental Assessment [ M ]. London : Earthscan Publications Ltd. , 1992:36 - 38.
  • 3李巍,李贞,李天威.战略环境评价发展、经验与应用实践[J].北京:化学工业出版社,2006:9-11.
  • 4Stinchoeombe K, Gibson R B. Strategic environmental assessment as a means of Pursuing sustainability:ten advantage and ten challenges [ J ]. Journalof Environmental Assessmenta Policy and Management,2001,3(3) :545 -372.
  • 5骆天庆.中国规划环境影响评价机制的实践思考[J].科学管理研究,2006,24(3):20-23. 被引量:9
  • 6毛文永.生态环评概论[M].北京:中国环境科学出版社,2003.

二级参考文献8

共引文献8

同被引文献6

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部