摘要
阐述了时空效应规律在黄土深基坑工程中的运用情况,最后指出,在基坑开挖设计施工时,应充分考虑时空效应,做到分层分段开挖和及时支撑,以减小每步开挖的空间尺寸和开挖、支撑时间,减小基坑变形。
The application of time- space effect theory in loess region foundation pit work is introduced in this paper , which points out that time - space should be considered fully during the deep foundation pit design and construction process. To reduce the excavation space dimensions each step, support time and the pit deformation, we should achieve hierarchical segmentation excavation and support timely.
出处
《鸡西大学学报(综合版)》
2012年第8期53-54,共2页
JOurnal of Jixi University:comprehensive Edition
关键词
时空效应
深基坑
分步开挖
time - space effect
a deep pit
step - by - step excavation